Warruwi Drainage works and roadworks

Client: West Arnhem Regional Council
Project: $583,000
Duration: 8 weeks
Project Overview:
This Project Consists of the following works:
• Stone Pitching and concrete works
• Drainage upgrades
• Roadworks


The first stage of the works consisted of installing 24 culverts, Cleaning and Shaping the drains to let the water flow and increase the drainage capacity:

Stone pitching and concrete works:
The Second stage of the works consisted of stone pitching works to protect the drains from scouring. Concrete margins with weep holes were constructed along a 2 km road to assist in subsurface drainage.
2 concrete floodways were also installed.

Road works:
The third stage of the works consist of 1km of road works with concrete margins on both sides and a 2 coat 7mm/14mm spray seal.